Question No.221

When a Belt creates a Process Map she will use a to depict a decision point requiring a Yes or No decision.

  1. Circle

  2. Square

  3. Diamond

  4. Rectangle

Correct Answer: C

Question No.222

The validity of the decision made with Hypothesis Testing is dependent upon all of the following except .

  1. Beta risk

  2. Range of data

  3. Alpha risk

  4. Sample size

Correct Answer: B

Question No.223

What is the Ppk of a process with a spread of 24 units, an average of 68, an upper limit of 82 and a lower limit of 54?

A.

1.68

B.

2.00

C.

4.00

D.

4.42

Correct Answer: C

Question No.224

Some of the sources for different types of error that can be quantified using Statistical Analysis are which of these?

  1. Error in sampling

  2. Bias in sampling

  3. Error in measurement

  4. All of the above

Correct Answer: D

Question No.225

Fractional Factorial designs are used to reduce the time and cost of experiments because the

has been lowered.

  1. Number of data measurement points

  2. Number of runs

  3. People involved

  4. Output summary

Correct Answer: B

Question No.226

Special Cause Variation falls into which two categories?

  1. Natural amp; Unnatural

  2. Short Term amp; Long Term

  3. Assignable amp; Pattern

  4. Attribute amp; Discreet

Correct Answer: C

Question No.227

The English words used for the 5S#39;s are , , Shining, Standardizing and Sustaining. (Note:There are 2 correct answers).

  1. Shaping

  2. Sorting

  3. Shifting

  4. Straightening

Correct Answer: BD

Question No.228

Which of these might contribute to similar distributions having Unequal Variance?

  1. Extreme tails

  2. Outliers

  3. Multiple Modes

  4. All of the above

Correct Answer: D

Question No.229

The reported Cpk for a process with an average of 104 units, a spread of 18 units and upper and lower specification limits of 122 and 96 units would be?

A.

0.5

B.

0.89

C.

1.00

D.

2.00

Correct Answer: B

Question No.230

Two of the key deliverables for the Measure Phase are a robust description of the process and its flow and an assessment of the Management System.

  1. True

  2. False

Correct Answer: B